HQ ADDRESS
Istanbul, Turkiye
OPENING HOURS
Monday – Thursday
9:30AM to 6PM
Friday
9:30AM to 4PM
Phone
+90 216 474 4000
Mobile
+90 552 849 45 29
Our steam boilers can be designed at desired capacity and pressure. All fittings and equipments can be manufactured assembled on the boiler as a package system. It shall be designed and manufactured in accordance with TS 377 EN 12953 Standard.
19Mn6 (P355GH) and 17Mn4 (P295GH) materials in accordance with TS EN 10028-2 norm are used in our boilers and all are A1 quality and TS EN 10204 / 3.1 certified. The pipes used in our boilers are Borusan MANNESMAN stitched, annealed, normalized boiler pipes which comply with TS EN 10217-2 norm.
Boiler mirrors are cut with plasma without touching and all of the pipes are welded to the mirror. Our boilers are welded by welders certified by Türk LOYDU.
Material certificates used, welding method specifications, welder certificates, reports of non-destructive tests applied during manufacture and hydrostatic pressure test report shall be provided as a technical file if requested.
Leaving 5 years behind in the boiler and pressure vessels sector, SITM and its partners have worked in numerous projects in our country and abroad since its establishment and has produced and installed more than 2,500 Scotch type steam boilers.
Guarantee
All of SITM products are two years guaranteed. Please refer to the contract for detailed terms.
Shipping
We ship to all over Europe.
Assistance
Contact us on +90 552 849 45 29, or email us at [email protected]